When can you allow traffic on a new concrete surface?

Concrete is fully cured and has reached its full Compressive strength at 28 days, period.
After 3 days normal foot traffic may resume but avoid dragging heavy items.
We request that you not drive on the new concrete for 7 days.

Sometimes people dont want to wait long and drive on the concrete placed 3 days before. It can be done with small cars and light trucks but it should be wait for 7 days. The full 28 days for heavy equipment or large heavy trucks.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s